1) What is the 1st step in the 5S process? a) Standardized b) Sort c) Sweep d) Sustain 2) Thick dark line use to show outline of object, visible edges, and surfaces. a) Vissible line b) Hidden line c) Construction line d) Dimension line 3) Very light and thin line use to construct layout work. a) Construction lonr b) Dimension line c) Visible line d) Hidden line 4) Short dash lines use to show nonvisible surfaces. Usually shows as medium thickness. a) Dimension line b) Hidden line c) Leader line d) Section line 5) Medium line with arrowhead to show notes or label for size or special information about a feature. a) Construction line b) Leader line c) Section line d) Visiblle line

Technical Drafting 7

Lestvica vodilnih

Vizualni slog

Možnosti

Preklopi predlogo

Obnovi samodejno shranjeno: ?