1) Which document states the safe process for completing work? a) Specification b) Variation order c) Programme of work d) Method Statement 2) Using a scale of 1:20, a 10mm line would represent? a) 2mm b) 20mm c) 200mm d) 2000mm 3) what is the symbol shown? a) WC b) SINK c) DOOR d) WINDOW 4) What is the hatching shown? a) Concrete b) Brickwork c) Insulation d) Stone 5) what is established by using a site datum? a) Transferred levels b) Building line c) frontage line d) Frame position 6) Which one of the following is most commonly used to insulate the floor of a loft space? a) Expanded polystyrene b) Mineral wool roll c) Multi-foil board d) Plaster board 7) Which one of the following components will reduce the water consumption of a toilet? a) isolation valve b) Dual flush c) smaller soil pipe d) plastic pipework 8) which one of the following energy sources involves the burning of wood? a) Heat recovery b) Biomass heating c) Turnbines d) Ground source heat pump 9) Which one of the following is an environmentally friendly building material? a) Medium density fibreboard (MDF) b) Polyisocyanurate (PIR) c) Forest stewardship council(FSC) timber d) Expanded polystyrene 10) What does local exhaust ventilation manage on a construction site? a) Plant fumes b) Wood dust c) Brick offcuts d) Paint Spillages 11) When building a house, which one of the following foundation types would be used in unstable soft ground? a) Pad b) Raft c) Stepped d) Strip 12) Which one of the following reduces the amount of voids in a concrete mix? a) course aggregate b) Retardant c) Frost proofing d) Fine aggregate 13) in a concrete mix ratio of 1:2:4, the 2 represents? a) Water b) Cement c) Fine aggregate d) Course aggregate 14) when excavating for foundations to a new extension, which one of the following should be removed to avoid structural damage to the building? a) Tree roots b) Existing DPC c) Gas pipes d) Drainage pipes 15) To transfer datum, a spirit level can be used with a ? a) Building line b) Straight edge c) Timber batten d) Builders square 16) Which one of the following components is used to support the masonry above a door opening? a) Cavity closures b) Air brick c) Wall ties d) Lintel 17) Which one of the following wall components prevents moisture rising up the wall from the ground? a) Cavity tray b) DPC c) Wall ties d) Cavity closure 18) Which one of the following additives speeds up the setting time of mortar? a) Retardant b) Plasticiser c) Cement dye d) Accelerant 19) which brick bond is shown? a) Herringbone b) English c) Flemish d) Stretcher 20) If an internal wall is carrying weight from the floor above then it ? a) is a load bearing wall b) is a non load bearing wall c) must not have openings d) is always made from timber 21) 1 litre of emulsion covers 13M2 . how many litres are needed for a wall with an area of 52M2 If two coats are required? a) 2 litres b) 3 litres c) 6 litres d) 8 litres 22) Which one of the following describses a sand and cement floor screed? a) An insulating layer of concrete b) A damp proofing layer over a concrete base c) A finishing layer to the hardcore d) A finishing layer applied to concrete base 23) When constructing a suspended timber floor which one of the following describes the purpose of a joist hanger? a) To support the joist end b) A damp proofing shoe to protect joists c) The strap restraining the joists d) Away of preventing joists twisting 24) 40 M of floor boarding is required for a job, however 10% waste has not been included. what is the total amount of boarding that needs to be ordered, including waste? a) 40M b) 44M c) 48M d) 54M 25) Which type of roof has joists but no rafters ? a) Flat roof b) Lean to c) Hipped d) Gable ended 26) In construction who is responsible for the design of the building? a) Estimator b) Architect c) Site supervisor d) Project manager 27) Which operative would not be involved in first fix communication with the supervisor? a) Tiler b) Plumber c) Carpenter d) Electrician 28) Which one of the following is not recorded on a requisition sheet when ordering materials from the site store? a) Size b) Returns c) Type d) Quantity 29) Which one of the following is the most efficient way of informing operatives of health and safety requirements at the start of the working day? a) Signs b) Toolbox talk c) Texts d) Two Way radio 30) Poor communication in the workplace can lead to ? a) Delays b) Productivity c) Team bonding d) Improved public relations 31) All operatives must be aware of any changes to the ? a) Cost of material b) Suppliers contact details c) Method statement d) Architects contact details 32) What is the main benefit of using positive communication with a team member? a) It guarantees a promotion b) It ensures they work faster c) It can improve their motivation d) It complies with legislation

level 2 principles of construction

аутор

Табела

Визуелни стил

Поставке

Промени шаблон

Врати аутоматски сачувано: ?