1) Would Peter do more work if he ran instead of walking up a hill? a) Yes b) No 2) How much work does Paul do when he lifts a box weighing 250N off the floor to a shelf 2m high? a) 500J b) 0.005kJ c) 125J d) 125kJ 3) Tom does 3000J of work in pushing a small van a distance of 10m. How big is the friction force he has to push against? a) 30,000N b) 0.003N c) 300N d) 3000N 4) Beth is stacking a food shelf with tins each weighing 12N. When she has put 20 tins on the shelf she calculates she has done 288J of work. How high is the shelf? a) 24m b) 3456m c) 240m d) 1.2m 5) On a building site Crane A lifts a steel girderonto a building in 60 seconds. Crane B takes 40 seconds to do the same job which is the most powerful? a) Crane A b) Crane B 6) Neil can lift 20 weights, each weighing 30N, through a height of 2m in 60 seconds. Calculate Neils power. a) 600W b) 300W c) 1200W d) 20W 7) Sarah can do 24 step ups in 30 seconds the step up is 12cm high calculate Sarah's power if she weighs 500N a) 2.88W b) 60W c) 48W d) 1440W 8) A 25kW motor raises a 5000N load through a height of 40m. How long does it take? a) 200,000s b) 8s c) 8000s d) 200s
0%
Power and Work done quiz
共用
共用
共用
由
Andrewhartley
Secondary
Physics
編輯內容
列印
嵌入
更多
作業
排行榜
顯示更多
顯示更少
此排行榜當前是私有的。單擊
共用
使其公開。
資源擁有者已禁用此排行榜。
此排行榜被禁用,因為您的選項與資源擁有者不同。
還原選項
測驗
是一個開放式範本。它不會為排行榜生成分數。
需要登錄
視覺風格
字體
需要訂閱
選項
切換範本
顯示所有
播放活動時將顯示更多格式。
打開結果
複製連結
QR 代碼
刪除
恢復自動保存:
?