Cavity lintel, 150mm bearing, Concrete lintel, 100mm bearing, DPC, Stops rising damp, minimum 150mm above ground level, Partial fill insulation, Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation, Blown in at a later date, EWI insulation, Fitted on external leaf, Vertical damp course, Prevents ingress of damp up openings, Cavity tray, Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes, Allows moisture to leave the cavity, DPM, Stops damp rising through the floor, Wall ties, 450mm x 900mm spacings, Expansion wall ties, Allows movement on long lengths of masonry, Restraint straps, Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate, Spreads the weight of the roof down the masonry, Gable end, Proprietary wall starters, Where new masonry is attached to old masonry., Air bricks, Allows air flow to enter the build, Architects drawings and specification, Where we can find information on components, Window sill, Direct water to outer leaf under a window., Full-fill insulation, Allows air flow through the fibres., Cavity closer, Seals cavity at an opening.
0%
Walling components
共用
共用
由
Stephenbull
Workplace
Construction
編輯內容
存檔
喜歡
列印
嵌入
更多
需要登錄
視覺風格
字體
活動設定
排行榜
作業
需要訂閱
活動設定
排行榜
此排行榜當前是私有的。單擊
共用
使其公開。
資源擁有者已禁用此排行榜。
此排行榜被禁用,因為您的選項與資源擁有者不同。
還原選項
顯示更多
顯示更少
刺破氣球
是一個開放式範本。它不會為排行榜生成分數。
作業
您尚未與學生分享任何活動
要開始收集結果,請轉到任何活動頁面,然後選擇
Set assignment(設置分配
)。
確認您的設置並與學生共用生成的連結。
課業分配
切換範本
顯示所有
打開結果
複製連結
QR 代碼
刪除
恢復自動保存:
?