EARTHWORKS: Structure Excavation, Structure Backfill, Gravel Bedding, Regular Fill, Concrete Works: Isolated Footing, Combined Footing, RC Column, RC Grade Beam, RC Tie Beam, RC Roof Beam, RC Stairwell, RC Countertop, Masonry Works: 100mm. Thk. CHB, 150mm. Thk. CHB, Plastering, Tile Finish, Waterproofing, Carpentry Works: Suspended Ceiling, Spandrel Ceiling, Cabinets & Shelves, Drywall Partition, Steel Works: Roof Framing Works, Handrailing, Sun Buffer, Fire Exit Ladder, Tinnery Works: LS Rib-type Rfg. Shts., LS Corrugated Rfg. Shts., Asphalt Shingle, Fabricated Rfg. Acc., Sanitary and Plumbing Works: Septic Vault, Waste &Vent Line, Water Line, Plumbing Fixtures, Catch Basin, Trench Drain,

VARIOUS ITEM OF CIVIL WORKS FOR VERTICAL PROJECTS

排行榜

視覺風格

選項

切換範本

恢復自動保存: ?