1) What certificate would be issued for new installation work? a) Minor Electrical Works Installation Certificate b) Electrical Installation Certificate c) Schedule of inspections d) Electrical Installation Condition Report 2) Which of the following is not required to sign an Electrical Installation Certificate? a) Designer b) Inspector c) Client d) Installer 3) On an EICR an observation Code 1 means a) Improvement recommended b) Potentially dangerous c) Danger present d) Not dangerous 4) On an EICR an observation Code 2 means a) Potentially dangerous b) Mostly dangerous c) Possibly dangerous d) Maybe dangerous 5) How many parts make up an Electrical Installation Certificate? a) 1 b) 2 c) 4 d) 3 6) According to Guidance Note 3 what is the maximum allowed time between initial verification & first condition report for a domestic premises? a) 100 years b) 5 years c) 15 years d) 10 years 7) An observation Code 3 would be attributed where a) An absence of notice indicating the installation has 2 colours to BS 7671 b) Electrical equipment having inadequate degrees of ingress protection c) Fire risk from lamps exceeding maximum rated wattage for luminaires d) Evidence of excessive heat from electrical equipment 8) An observation Code 1 would be attributed where a) An accessory is badly damaged b) Absence of CPC's in circuits having only Class II luminaires & switches c) There is an absence of identification labels d) a socket outlet is mounted in a position which may damage a plug/flex 9) A lighting circuit has been extended and a spur added to a ring final circuit, what certification would be issued? a) EICR b) Two MEIWC's c) EIC d) MEIWC 10) On completion of initial verification, who would receive the EIC? a) The designer b) The installer c) The inspector d) The client 11) What level of protection would be offered to the top horizontal surface of an enclosure? a) IPX4 b) IP4X c) IPX2 d) IP2X 12) Which of the following would not be a reason for requesting an EICR? a) Change of ownership b) Change of building use c) Extension to an existing circuit d) Previous certificate has expired 13) How many signatories are required on a MEIWC? a) 1 b) 2 c) 3 d) 4 14) Which earthing system is not recognised by BS 7671 for public distribution systems? a) TT b) TN-C c) TN-S d) TN-C-S 15) What level of protection should be afforded to the front surface of an enclosure? a) IPX4 b) IP4X c) IP2X d) IPX2 16) What is the categorisation of fuse that has replaced BS 1361? a) BS 1362 b) BS 3036 c) BS 88-2 d) BS 3871 17) RCD's & RCBO's with an IΔn of ≤ 30mA are installed as a means of offering a) Additional protection b) Extra protection c) Reactive protection d) Supplementary protection 18) A bare & unsleeved CPC of a twin & CPC cable would receive which Code? a) Code 1 b) Code 3 c) Code 2 d) FI 19) A bonding clamp to BS 951 with a missing label stating, "Safety Electrical Connection Do Not Remove" would receive a a) FI b) Code 3 c) Code 1 d) Code 2 20) A "borrowed neutral" e.g. where a single final circuit neutral is shared by two final circuits would be attributed a) Code 2 b) Code 3 c) FI d) Code 1
0%
Certification
共用
共用
共用
由
Wlcconstruction
編輯內容
列印
嵌入
更多
作業
排行榜
顯示更多
顯示更少
此排行榜當前是私有的。單擊
共用
使其公開。
資源擁有者已禁用此排行榜。
此排行榜被禁用,因為您的選項與資源擁有者不同。
還原選項
問答遊戲
是一個開放式範本。它不會為排行榜生成分數。
需要登錄
視覺風格
字體
需要訂閱
選項
切換範本
顯示所有
播放活動時將顯示更多格式。
打開結果
複製連結
QR 代碼
刪除
恢復自動保存:
?