1) 1. What is the cyde of Al projects primary objective? a) To create complex Al models quickly. b) To simplify the process of converting problems from the actual world into code c) To provide a structured framework for managing Al projects. d) To reduce the cost of developing Al-based remedies. 2) What is the initial stage of an Al project's lifecycle? a) Outlining the technology specifications for the Al model. b) Converting the real-world problem into an Al job with precise definitions c) Compiling and preparing the data required for the Al model's training. d) Selecting the Al algorithm that works best for the given job. 3) Which of the following metrics may be produced from a confusion matrix? a) Execution time and Memory usage b) Recall Precision, Accuracy, and F1 Score c) Learning rate and Batch size d) Data acquisition and Data cleaning 4) What is the primary purpose of the confusion matrix while evaluating an Al model? a) To measure the execution time of the model b) To identify the best algorithm for the model c) To measure the performance of an Al model using the test data d) To optimize the hyper parameters of the model 5) Problem scoping means selecting a problem and finding a solution for it using Al technology a) true b) false 6) Evaluation is a process that critically examines a program. a) true b) false 7) The deployment phase of the Al project cycle involves integrating the model into the production environment and does not require any further monitoring a) true b) False
0%
Ai project cycle class 9
共用
共用
共用
由
29111980winter
Class 9
Computer
編輯內容
列印
嵌入
更多
作業
排行榜
顯示更多
顯示更少
此排行榜當前是私有的。單擊
共用
使其公開。
資源擁有者已禁用此排行榜。
此排行榜被禁用,因為您的選項與資源擁有者不同。
還原選項
測驗
是一個開放式範本。它不會為排行榜生成分數。
需要登錄
視覺風格
字體
需要訂閱
選項
切換範本
顯示所有
播放活動時將顯示更多格式。
打開結果
複製連結
QR 代碼
刪除
恢復自動保存:
?