1) what is the step 2 in system development life cycle? a) planning b) implementation c) design d) analysis e) maintanence 2) two activities involved during planning phase. a) allocate resources b) conduct preliminary investigation c) develop details of system d) review and approve the project requests 3) what is the SDLC phase for convert to a new system? a) design b) implementation c) maintanence d) planning 4) what is the purpose of system test? a) to verifies that all programs in an application work together properly b) to checks the new system to ensure that it works with the actual data c) to verifies that each individual program work by itself 5) what is the activities involved during phase maintenence? a) train users b) assess system security c) recommend sollution d) monitor system performances 6) what is the approach for analysis and design? a) object modelling b) develop custom software c) modify current system d) project modelling 7) what is the step 5 in SDLC? a) design b) maintenece c) planning 8) what is working model of a proposed system? a) vendor b) outsourcing c) prototype d) system proposal
0%
System Development Life Cycle
مشاركة
مشاركة
مشاركة
بواسطة
Rozaidisara
تحرير المحتوى
طباعة
تضمين
المزيد
الواجبات
لوحة الصدارة
عرض المزيد
عرض أقل
لوحة الصدارة هذه في الوضع الخاص حاليًا. انقر على
مشاركة
لتجعلها عامة.
عَطَل مالك المورد لوحة الصدارة هذه.
عُطِلت لوحة الصدارة هذه حيث أنّ الخيارات الخاصة بك مختلفة عن مالك المورد.
خيارات الإرجاع
الطائرة
قالب مفتوح النهاية. ولا يصدر عنه درجات توضع في لوحة الصدارة.
يجب تسجيل الدخول
النمط البصري
الخطوط
يجب الاشتراك
الخيارات
تبديل القالب
إظهار الكل
ستظهر لك المزيد من التنسيقات عند تشغيل النشاط.
فتح النتائج
نسخ الرابط
رمز الاستجابة السريعة
حذف
استعادة الحفظ التلقائي:
؟