What does SMART target stand for - Specific, Measurable, Achievable, Realistic, Timely, What is a Project? - A project is a problem scheduled for solution, The process of risk management is designed to? - Identify risks, Assess their severity and likelihood, Avoid the risks if possible, Prevent risks turning into problems that affect the success of a project, Why is R&D important? - To keep up and improve a project to extract its maximum , What is Kaizen - A Japanese term meaning to change for the better or continuous improvement, Name a potential project constraint - Time, Budget, Work space, H/S, Location, Logistics, Equipment, Environment, Permission, What does a Matrix system look like?, What is an example of technological development - Candle --> Gas Light --> Light Bulb --> LED,
0%
Project Management
مشاركة
مشاركة
مشاركة
بواسطة
U20lmallett
تحرير المحتوى
طباعة
تضمين
المزيد
الواجبات
لوحة الصدارة
البطاقات التعليمية
قالب مفتوح النهاية. ولا يصدر عنه درجات توضع في لوحة الصدارة.
يجب تسجيل الدخول
النمط البصري
الخطوط
يجب الاشتراك
الخيارات
تبديل القالب
إظهار الكل
ستظهر لك المزيد من التنسيقات عند تشغيل النشاط.
فتح النتائج
نسخ الرابط
رمز الاستجابة السريعة
حذف
استعادة الحفظ التلقائي:
؟