1) Which document indicates when materials should be ordered for a construction project? a) Time sheet b) Day work sheet c) Programme of work d) Method statement 2) On a working document drawing with a scale of 1:200, what length would a 10mm line represent? a) 2mm b) 20mm c) 200mm d) 2000mm 3) What does this symbol show? a) Sawn wood b) Planed wood c) Insulation d) Concrete 4) What symbol is shown here? a) WC b) Sink c) Door d) Window 5) What does this hatching represent? a) Concrete b) Brickwork c) Insulation d) Stone 6) What does this symbol represent? a) a. Sink b) b. Window c) c. Door d) d. Wardrobe 7) What does this symbol show? a) a. Window b) b. Door c) c. Bath d) d. Kitchen unit 8) Which one of the following is the name given to a fixed level determined on site? a) Building line b) Frontage line c) Temporary benchmark d) Ordinance survey benchmark 9) What method is used to check for square when setting out a building? a) Use a laser level b) Measuring the diagonals c) Using a site datum d) Measuring for parallel 10) Which of these insulation materials is most flexible? a) Multi-foil b) Cavity bats c) Polyisocyanurate d) Expanded polystyrene 11) Which one of the following is installed to collect water for re-use? a) Septic tank b) Soakaway c) Water harvesting d) Ground water pumping 12) Which one of the following is a term used when burning wood to create heat energy? a) Heat recovery b) Biomass heating c) Solar heating d) Ground source heat 13) Which one of the following is the most environmentally friendly building material? a) a. Imported timber b) b. Reinforced concrete c) c. Locally sourced timber FSC (Forest Stewardship Council) d) d. Expanded polystyrene 14) What does the 2 represent in a concrete mix ratioof 1:2:4? a) Water b) Cement c) Fine aggregate d) Coarse aggregate 15) Which one of the following materials should not be disposed in general waste skip? a) Hardcore b) Plasterboard c) Brick rubble d) Soil 16) Which of the following factors is considered when selecting foundation design? a) Wall construction b) Type of concrete used c) Cost of concrete d) Ground condition 17) Which one of the following ratios is used when setting out a right angle for a building? a) a. 1:2:3 b) b. 2:3:4 c) c. 3:4:5 d) d. 4:5:6 18) Which one of the following makes up the bulk of a concrete mix? a) Course aggregate b) Retardant c) Cement d) Fine aggregate 19) The proximity of neighbouring buildings and tree roots must be considered when? a) Excavating for foundations b) Establishing a building line c) Establishing a frontage line d) Excavating to remove top soil 20) Which one of the following levels provides the most accurate results when transferring the foundation level from a datum on site? a) a. Laser b) b. Water c) c. Spirit d) d. Boat 21) What is this brick bond called? a) Herringbone b) Stretcher c) Flemish d) English 22) What is this brick bond called? a) a. Flemish b) b. English c) c. Common d) d. Monk 23) What is this brick bond? a) a. English b) b. Herringbone c) c. Garden wall d) d. Custom 24) Which one of the following is a common mix ratio for concrete foundations? a) a. 1:1:5 b) b. 1:1:6 c) c. 1:2:4 d) d. 1:4:8

Unit 202 Principles of Building PRT 1

Výsledková tabule/Žebříček

Vizuální styl

Možnosti

Přepnout šablonu

Obnovit automatické uložení: ?