Mark the centre of wall measurements on the ground., Excavate trench/strip to the correct depth, Pour concrete into the trench., Install the reinforcement into the poured concrete., Ensure the concrete is level., Construct walls to DPC., Backfill as required..

Výsledková tabule/Žebříček

Vizuální styl

Možnosti

Přepnout šablonu

Obnovit automatické uložení: ?