Which of these activities take place during system implementation? , data converstion and changeover method identified, writing programs, writing user and technical documentation, testing the system, all of the above, The build is part of implementation and focuses on: , Development, coding and intitial testing, Deployment, user training, Ensuring system functionality in a live environment, Direct changeover method, high risk, low cost, low risk, high cost, medium risk, Direct changeover, old system is discontinued and replaced immediately by new system, old and new run side by side for a period of time, new system is introduced one component at a time, new system is first test in one department or location , Phased, old and new run side by side for a period of time, new system is introduced one component at a time, new replaces old with no overal, new system is tested first in one location before rollout, Pilot, component by component, new replaces old, no overlap, new system is tested in one location before rollout, old and new run side by side for a period of time, Parallel running, both systems run together for a period of time, new system is first tested in one locaiton before rollout, gradually introduced, new replaces old immediately, Only one section of the organisation is affected at a time, phased, direct, pilot, parallel, Less stressful for staff as they are introduced to changes in stages, direct, phased, parallel, pilot, Changeover can take a long time with this method, direct, parallel, phased, Old system is there as a backup should the new system fail, pilot, phased, parallel, Duplication of resources, direct, parallel, Not suitable for critical systems where no downtime is possible, phased, direct, pilot, New system is up and running immediately, Pilot, Phased, Direct, Parallel.
0%
Changeover methods
Teilen
Teilen
Teilen
von
Jbarr2
Inhalt bearbeiten
Drucken
Einbetten
Mehr
Zuweisungen
Bestenliste
Mehr anzeigen
Weniger anzeigen
Diese Bestenliste ist derzeit privat. Klicke auf
Teilen
um sie öffentlich zu machen.
Diese Bestenliste wurde vom Eigentümer der Ressource deaktiviert.
Diese Bestenliste ist deaktiviert, da sich Ihre Einstellungen von denen des Eigentümer der Ressource unterscheiden.
Einstellungen zurücksetzen
Öffnen Sie die Box
ist eine Vorlage mit offenem Ende. Es generiert keine Punkte für eine Bestenliste.
Anmelden erforderlich
Visueller Stil
Schriftarten
Abonnement erforderlich
Einstellungen
Vorlage ändern
Alle anzeigen
Weitere Formate werden angezeigt, wenn du die Aktivität spielst.
)
Offene Ergebnisse
Link kopieren
QR-Code
Löschen
Soll die automatisch gespeicherte Aktivität
wiederhergestellt werden?