The portion of the process scheduler in an operating system that dispatches processes is concerned with ____________, a) assigning ready processes to CPU, b) assigning ready processes to waiting queue, c) assigning running processes to blocked queue, d) all of the mentioned, The strategy of making processes that are logically runnable to be temporarily suspended is called ____________, a) Non preemptive scheduling, b) Preemptive scheduling, c) Shortest job first, d) First come First served, Orders are processed in the sequence they arrive if _______ rule sequences the jobs., a) earliest due date, b) slack time remaining, c) first come, first served, d) critical ratio, Which of the following algorithms tends to minimize the process flow time?, a) First come First served, b) Shortest Job First, c) Earliest Deadline First, d) Longest Job First, Which of the following statements are true? (GATE 2010) I. Shortest remaining time first scheduling may cause starvation III. Round robin is better than FCFS in terms of response time II. Preemptive scheduling may cause starvation III. Round robin is better than FCFS in terms of response time, a) I only, b) II only, c) I and II , d) None of the above, Round robin scheduling falls under the category of ____________, a) Non-preemptive scheduling, b) Preemptive scheduling, c) All of the mentioned, d) None of the mentioned, An SJF algorithm is simply a priority algorithm where the priority is ____________, a) the predicted next CPU burst, b) the inverse of the predicted next CPU burst, c) the current CPU burst, d) anything the user wants, What is ‘Aging’?, a) keeping track of cache contents, b) keeping track of what pages are currently residing in memory, c) keeping track of how many times a given page is referenced, d) increasing the priority of jobs to ensure termination in a finite time, Which of the following scheduling algorithms gives minimum average waiting time?, a) FCFS, b) SJF, c) Round – robin, d) Priority, The interval from the time of submission of a process to the time of completion is termed as ____________, a) waiting time, b) turnaround time, c) response time, d) throughput.
0%
CPU Scheduling Algorithms
Teilen
Teilen
Teilen
von
Arunam
Inhalt bearbeiten
Drucken
Einbetten
Mehr
Zuweisungen
Bestenliste
Mehr anzeigen
Weniger anzeigen
Diese Bestenliste ist derzeit privat. Klicke auf
Teilen
um sie öffentlich zu machen.
Diese Bestenliste wurde vom Eigentümer der Ressource deaktiviert.
Diese Bestenliste ist deaktiviert, da sich Ihre Einstellungen von denen des Eigentümer der Ressource unterscheiden.
Einstellungen zurücksetzen
Quiz
ist eine Vorlage mit offenem Ende. Es generiert keine Punkte für eine Bestenliste.
Anmelden erforderlich
Visueller Stil
Schriftarten
Abonnement erforderlich
Einstellungen
Vorlage ändern
Alle anzeigen
Weitere Formate werden angezeigt, wenn du die Aktivität spielst.
)
Offene Ergebnisse
Link kopieren
QR-Code
Löschen
Soll die automatisch gespeicherte Aktivität
wiederhergestellt werden?