The new hydraulic pump was installed., The damaged panel was removed from the access bay., The area was cleaned before the replacement part was installed., The pressure readings were checked during the test., All bolts were tightened using a torque wrench., The hydraulic lines were inspected for any signs of leakage., The results were recorded in the maintenance log., The removed parts were placed on a clean workbench., The connectors were lubricated before reassembly., Normal pressure was restored after the repair.,

Bestenliste

Visueller Stil

Einstellungen

Vorlage ändern

Soll die automatisch gespeicherte Aktivität wiederhergestellt werden?