1) BIM means a) Building in modelling b) Brick information module c) Building Information Modelling d) Brickwork information memo 2) BIM a) Allows collaboration between every designer b) Supports team co-ordination c) Enhances the project design d) Identifies clashes of systems e) All of the above 3) CDE means a) Common Data Event b) Common Data Enclosure c) Construction Design Environment d) Create Data Everyday 4) BEP a) Brickwork Ensures Planning b) Bim Execution Plan c) Building Encoded Procedure d) Brickwork Extended Plan 5) Virtual models allows a) an audience to view the project in 3 dimensions b) For alterations to be made c) For the clients expectations to be met d) For 360 degrees range of movement e) All of the above 6) HMD allows a) The user to have an headache b) Tracks a range of movement over 360 degrees c) The input to become a reality d) You to look around the space in a building 7) AR means that the users are a) Shut off from reality b) Not shut off from reality 8) MR allows the user to see the a) Real world with a virtual image overlaid b) Nothing 9) Evolving materials allow for a) Greater efficiency b) Long term cost saving c) Poor durability d) Non sustainable 10) Pourous means a) No water can pass through b) No air can pass through c) Have minute holes that air and water can pass through 11) Baffle is a) When you don't know how to do something b) Nice when served with syrup c) A device that controls or constraints the flow d) Helping to control the thermal energy of building 12) Transparent a) Allows light to pass through b) Don't allow any light to pass through 13) Concrete has high compressive strength a) False b) True 14) Prefabrication also referred to as a) A pop band b) Modular Construction c) Traditional Building d) Off site Construction 15) Carbon emission a) Are released into the atmosphere b) Cause climate change 16) Benefits of modular construction a) Assembled quickly b) Sustainable c) Utilizes low energy manufacturing d) Uses recyclable building materials 17) Prefabrication a) Reduces construction time b) Unaffected by the weather c) Provides financial value d) Consistent quality 18) Prefabrication was developed due to a) Housing shortage b) Urgently provide homes 19) What working document specifies what the client wants a) Work concept b) Design brief c) Work protocol d) Data brief 20) Which construction methods involes fitting together factory made room modules on site to create a building a) Panelised b) Volumetric c) Specialsit d) Traditional

Unit 106 Emerging technologies

Tabla de clasificación

Estilo visual

Opciones

Cambiar plantilla

¿Restaurar actividad almacenada automáticamente: ?