1) Which document indicates when materials should be ordered for a construction project? a) Time sheet b) Daily work sheert c) Programme of works d) Method statement 2) On a working drawing with a scale of 1:200, what length would a 10mm line represent? a) 2mm b) 20mm c) 200mm d) 2000mm 3) What does this symbol represent? a) Sawn wood b) Planed wood c) Insulation d) Concrete 4) What does this symbol represent? a) WC b) Sink c) Door d) Window 5) What does this hatching represent? a) Concrete b) Brickwork c) Insulation d) Stone 6) What does this symbol represent? a) Sink b) Window c) Door d) Wardrobe 7) What does this symbol represent? a) Window b) Door c) Bath d) Kitchen unit 8) What does this symbol represent? a) Brickwork b) Subsoil c) Timber d) Blockwork 9) Which of the following is the name given to a fixed level determined on site? a) Building line b) Frontage line c) Temporary benchmark d) Ordinance survey benchmark 10) What method is used to check for square when setting out a building? a) Use a laser level b) Measure the diagonals c) Use a site datum d) Measuring for parallel

Classifica

Stile di visualizzazione

Opzioni

Cambia modello

Ripristinare il titolo salvato automaticamente: ?