sea level, it is the elevation than a field have reec with the sea level, field, it is the main part where we are going to contruct the road, horizontal alignment, it is the route that the road should to follow without change the elevation or the sea level in the plane, vertical alignment, that is the curves than a route should to follow for a while, and it change the elevation of the field where we are going to construct the road, pile, it is a fundation than we use in a bridge, a house or build, this element ir bigger than a piling, foundations, it is one of the most important parts of a construction of a build or road, it is going down the earth, BIM, building information modeling, concrete, it is the combination of whather, sand, grave and cement, and we have to wait for a while, filter, it is something than take wather to take care of bae and sub base, ditch, it is a hole, volume, it is the unit of meditionin cubic meters, gang or squad, 4 black mans, excavator, it is a machine than we use to retirate earth from the field
0%
jm
Ibahagi
Ibahagi
Ibahagi
ni
Juanjaime7878
I-edit ang Nilalaman
I-print
Naka-embed
Higit pa
Mga Assignment
Leaderboard
Magpakita pa
Huwag gaanong magpakita
Ang leaderboard na ito ay kasalukuyang pribado. I-click ang
ibahagi
upang gawin itong pampubliko.
Ang leaderboard na ito ay hindi pinagana ng may-ari ng aktibidad.
Hindi pinagana ang leaderboard na ito dahil ang iyong mga pagpipilian ay naiiba sa may-ari ng aktibidad..
Ibalik ang Opsyon
Pagtutugma
ay isang bukas na template. Hindi ito bumubuo ng mga marka para sa isang leaderboard.
Kailangan maglog-in
Estilo ng visual
Mga Font
Kailangan ang subscription
Mga pagpipilian
Magpalit ng template
Ipakita lahat
Mas marami pang format ang lilitaw habang nilalaro ang aktibidad.
Buksan ang mga resulta
Kopyahin ang link
QR code
Tanggalin
Ibalik ng awtomatikong pag-save:
?