Mark the centre of wall measurements on the ground., Excavate trench/strip to the correct depth, Pour concrete into the trench., Install the reinforcement into the poured concrete., Ensure the concrete is level., Construct walls to DPC., Backfill as required..

Skor Tablosu

Görsel stil

Seçenekler

Şablonu değiştir

Otomatik olarak kaydedilen geri yüklensin mi: ?