When selecting materials, what documents do we refer to? , Drawings and specifications, Method Statement, Risk Assessment, Programme of works, Why do we ensure correct ratio's when mixing? , It's British law. , The customer has asked for it, Ensure consistency throughout the build, We need to ensure our mix is weak, When cutting, what rule do we follow?, Cut - measure - mark, Mark - measure - cut, Mark - cut - measure, Measure - mark - cut, Where should materials be placed when mixing? , At the site entrance, Next to the mixing area, On the scaffold, Near the site boundary, Identify the tool used to find angles when cutting. , , , , , Identify the items of PPE that would give you the best protection when cutting with a masonry saw., Safety boots and hard hat, High Vis vest and visor, Safety goggles and ear defenders, Overalls and sunscreen, What should we do with our back when lifting materials?, Keep it bent, Keep it 90 degrees, Keep is 45 degrees, Keep it straight, Identify the main reason we should use lifting aids as much as possible. , Saves money, Avoiding manual handling, Insurance purposes, We have the training, Why should materials be stored just away from the trench edge?, To avoid trench collapse, So we have to walk to get them, To encourage stretching, To make it harder for us, When building a standard cavity wall, where would the blocks be loaded out to? , External side, Internal side, In the cavity, Below DPC, Identify the best reason why our working platforms are kept tidy, To make cleaning up easier, To avoid damage to brick face, To keep the customer happy, To avoid slips and trips, Where can spilled mortar end up when it splatters?, On the brickface, In the skip, On the customers head, On a public highway, Find the reason we cover all materials when not in use., To prevent theft, To prevent insect attack, To protect against inclement weather, To aid in building, When is the best time to install stone decorative features?, Before works commences , During the building process, After the building process, One week after the building process, Identify how we protect newly laid masonry from frost., Hessian, Polythene, Tarpaulin , Carpet, Identify how we protect newly laid masonry from rain, Hessian, Polythene, Carpet, Cardboard.
0%
Preparing materials
Chia sẻ
Chia sẻ
Chia sẻ
bởi
Stephenbull
Workplace
Construction
Chỉnh sửa nội dung
In
Nhúng
Nhiều hơn
Bảng xếp hạng
Xem những người chơi hàng đầu
Tập
Bảng xếp hạng
Hiển thị thêm
Ẩn bớt
Bảng xếp hạng này hiện đang ở chế độ riêng tư. Nhấp
Chia sẻ
để công khai bảng xếp hạng này.
Chủ sở hữu tài nguyên đã vô hiệu hóa bảng xếp hạng này.
Bảng xếp hạng này bị vô hiệu hóa vì các lựa chọn của bạn khác với của chủ sở hữu tài nguyên.
Đưa các lựa chọn trở về trạng thái ban đầu
Mở hộp
là một mẫu kết thúc mở. Mẫu này không tạo điểm số cho bảng xếp hạng.
Yêu cầu đăng nhập
Phong cách trực quan
Phông chữ
Yêu cầu đăng ký
Tùy chọn
Chuyển đổi mẫu
Hiển thị tất cả
Nhiều định dạng khác sẽ xuất hiện khi bạn phát hoạt động.
Bảng xếp hạng
Xem những người chơi hàng đầu
)
Mở kết quả
Sao chép liên kết
Mã QR
Xóa
Bạn có muốn khôi phục tự động lưu:
không?