The rehabilitation project IMROVE ACCESS to safe water in three rural communities., The installation of two large storage tanks helped INCREASE CAPACITY in the water system., Repairing the pumps helped REDUCE WAITING TIME at the communal water points., Technicians repaired the damaged boreholes to RESTORE FUNCTIONALITY to the pumping system., The project was designed to ADDRESS CHALLENGES related to water shortages and long collection times., Even after rehabilitation, the system must continue to MEET DEMAND as the population grows., In the future, the infrastructure may REQURE EXPANSION to support long-term sustainability.

3. Week 5: Collocation Practice

Leaderboard

Visual style

Options

Switch template

Continue editing: ?