The rehabilitation project IMROVE ACCESS to safe water in three rural communities., , The installation of two large storage tanks helped INCREASE CAPACITY in the water system., , Repairing the pumps helped REDUCE WAITING TIME at the communal water points., , Technicians repaired the damaged boreholes to RESTORE FUNCTIONALITY to the pumping system., , The project was designed to ADDRESS CHALLENGES related to water shortages and long collection times., , Even after rehabilitation, the system must continue to MEET DEMAND as the population grows., , In the future, the infrastructure may REQURE EXPANSION to support long-term sustainability., .

3. Week 5: Collocation Practice

Leaderboard

Visual style

Options

Switch template

Continue editing: ?