(A) Groove out the joints ready for welding, 10, (B) Lay tiles too main dinning area, 9, (C) Apply strips where required , 15, (D) set out main dinning area , 7, (E) Remove existing floorcoverings, 1, (F) Apply screed to the floor area, 3, (G) Apply adhesive to kitchen area, 5, (H) Set out tiles in buffet area, 12, (I) Thoroughly prepare the floor to remove old adhesive , 2, (J) Set out the kitchen area , 4, (K) Clear away all waste and leave floors in tidy condition, 16, (L) Lay carpet tiles to buffet area, 14, (M) Lay adhesive to buffet area, 13, (N) Weld joints in both the kitchen and walkway, 11, (O) Apply adhesive to main dinning area , 8, (P) Lay non-slip flooring to kitchen area, 6.