A. Engineers must take action, when problems occur on the construction site., B. The project manager allocated resources, by carefully assigning workers and machinery to each stage of the project., C. The construction team distributed materials, across different sections of the construction site., D. Cracks began to appear, in the bridge foundation after several years of heavy traffic., E. Workers laid asphalt, by installing new asphalt layers on the road., F. The company stored equipment, to keep tools and building materials safe during winter., G. The engineers succeeded in, by finishing the bridge construction earlier than planned., H. Some young engineers struggle with, when reading complex engineering drawings., I. Preparing construction plans can be, because engineers must check many technical details., J. Local authorities approved, before the construction project started., K. Road safety is a major concern, for engineers and project managers during highway construction., L. Surveyors must maintain precision, while measuring the road surface and structure levels., M. Every worker makes a contribution, to the successful completion of the highway project., N. The team repaired the damaged section, after heavy rain damaged the highway., O. The company built a storage area, to safely store machines and construction materials.

Leaderboard

Visual style

Options

Switch template

Continue editing: ?