Any working surface above ground exposing workers to fall hazards is :, Unsafe platforms, Elevated surface, Unguarded surface, High work area, Every construction project shall have a suitable _____, which must be in accordance with these rules, and other orders and issuances issued by the DOLE., Safety committee, Construction Safety and Health Program, Safety organization, Safety inspection plan, Every employer shall, at his own expense, furnish his workers with _____ for eyes, face, hands and feet, lifeline, safety belt/harness, protective shields and barriers whenever necessary by reason of the hazardous work process or environment, chemical or radiological or other mechanical irritants or hazards capable of causing injury or impairment in the function, Safety gear, Protective clothing, Personal Protective Equipment, Safety uniform, To ensure safety programs are enforced, construction sites must have minimum required:, Safety personnel, Safety inspectors, Safety officers, Health officers, Signs provided to warn workers and the public of hazards are called:, Warning signs, Construction safety signages, Hazard boards, Safety markers, It means one who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to workers, and who has authorization to take prompt corrective measures to eliminate them., Safety officer, Competent person, Site engineer, Safety manager, Sudden movement of soil inti an excavation trench is called:, Soil collapse, Landslide, Cave-in, Ground failure, It means a method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. These include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection., Shielding, Protective system, Trenching, Sloping, It means a method of protecting workers from cave-ins by excavating the sides of an excavation to form one or series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels., Sloping , Benching, Shielding, Bracing, Excavation method forming inclined sides away from the trench is:, Sloping, Benching, Shoring, Shielding, It means structure such as a metal hydraulic, mechanical or timber shoring system that supports the sides of an excavation and which is designed t prevent cave-ins., Bracing, Shoring, Shield, Sheet pile, Members of a shoring system retaining earth in place are:, Bracing, Sheetings, Shields, Supports, Structure that protects workers from cave-ins by withstanding soil forces is:, Shield, Sheet pile, Shoring, Bracing, A structure providing support to adjacent structures during excavation is:, Shield, Shoring, Support System, Reinforcement system, Scaffolds must support at least how many times the intended load?, 2, 3, 4, 5, What are the scaffold platform construction requirements?, 1 inch, 2 inches, 3 inches, 4 inches, What are the requirements for scaffold planking?, twice the intended load, three times the intended load, four times the intended load, five times the intended load, Maximum deflection of scaffold platform is:, 1/30 span, 1/60 soan, 1/90 span, 1/120 span, Minimum width of working area in scaffolding is:, 12 in, 15 in, 18 in, 24 in, Guardrails are required when scaffold height exceeds:, 6 ft, 8 ft, 10 ft, 12 ft, Permanent standpipe hose outlet diameter must be at least:, 2 cm, 3 cm, 4 cm, 5 cm, Permanent stand pipe installed in a construction site shall have a connection of the size used by the local fire department located in the street side nit more than ____ and not less than ____ above the ground level., 1 m & 0.20, 1 m & 0.33, 2 m & 0.40, 2 m & 0.50, Maximum weight for continuous lifting by a male worker is:, 40 kg, 45 kg, 50 kg, 60 kg, Shoring ir timbering in excavation over ____ deep must be designed by a structural engineer, 3.6 m, 4.6 m, 5.6 m, 6.6 m, Barrricade height for excavation deeper than 2m is at least:, 0.5 m, 1 m, 1.5 m, 2 m, Distance for demolition clearance zone is _____ times the structure height., 1, 1.5, 2, 3, No holes shall be drilled within ____ of a hole containing explosives., 2, 3.3 m, 4 m, 5 m, No holes shall be drilled within ___ of a hole loaded with expolsives., 3.6 m, 4.6 m, 6.6 m, 8.6 m, Which if the following equipment is commonly used to protect workers from falling objects on construction sites?, Safety goggles, Hard hat, Safety boots, Ear plugs, A confined space is best described as a space that:, Has sufficient ventilation and easy exit, Is designed for continuous worker occupancy , Has limited entry and exit and may contain hazardous atmosphere, Is located underground only, Which document outlines the safety procedures, responsibilities, and hazard control measures for a construction project?, Construction schedule, Safety and Health Program , Work permit, Technical specification, The minimum safe access to scaffolding platforms is usually provided by:, Ropes, Safety nets, Temporary ladders, Guardrails, Which of the following is the main purpose of safety training for workers in construction?, To increase production speed, To reduce labor cost, To prevent accidents and injuries, To simply construction processes, Which of the following dafety devices is used to arrest a worker’s fall from height?, Safety harness, Hard hat, Safety gloves, Safety goggles, Which of the following project management is appropriate for projects which are recurring in nature?, PERT, CPM, PERT and CPM, Project Management, A method for protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation so as to prevent cave-ins, Shoring, Sloping, Shielding, Trenching, Which if the following documents specifies the materials, workmanship, and standards required for construction work?, Bill of Quantities, Technical Specifications, Construction Schedule, Cost Estimate, In highway engineering, the distance required for a driver to perceive, react, and, bring the vehicle to a complete stop safely is called:, Passing Sight Distance, Stopping Sight Distance, Decision Sight Distance, Overtaking Sight Distance, In compass surveying, the difference between the true meridian and the magnetic meridian at a place is called:, Magnetic bearing, Declination, Local attraction, Azimuth.
0%
MSTE 2
Share
Share
Share
by
Hauengineers
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Quiz
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
)
Open results
Copy link
QR code
Delete
Continue editing:
?