Turn OFF the main switch, Continuity Test, Insulation Test, Polarity Test, Earthing Test, Disconnect all loads, Continuity Test, Insulation Test, Polarity Test, Earthing Test, Turn ON all switches, Continuity Test, Insulation Test, Polarity Test, Earthing Test, The reading should be not less than 1 MΩ, Continuity Test, Insulation Test, Polarity Test, Earthing Test, The reading should be less than 1 Ω, Continuity Test, Insulation Test, Polarity Test, Earthing Test, If the rreading isinfinity (∞), then the Circuit is, Open circuit, Short circuit, If the rreading zero Ohm, then the Circuit is, Open circuit, Short circuit, Inspection color code, Continuity Test, Visual Test, Polarity Test, Earthing Test, Inspection size of wire, Continuity Test, Visual Test, Polarity Test, Earthing Test, Inspection connection of conductors, Continuity Test, Visual Test, Polarity Test, Earthing Test.