A good project manager must always try to __________ before they cause a delay., suffer, anticipate problems, appear, The bridge project was much more difficult than expected because of its extreme __________., complexity, milestone, fair, After the technical error, the lead engineer had to __________ to fix the structure., be seasick, come up with a new plan, go over the budget, Because the supply chain was slow, the construction team is now three weeks __________., behind schedule, further, lateral, The company was forced to __________ after the price of steel doubled., figure out, involve, set a new budget, If you don't track your spending, it is very easy to __________., reduce the risks, go over the budget, facilitate communication, We just completed a __________ by finishing the underwater section of the bridge., setback, new milestone, lateral, The wind caused the __________ to move in a side-to-side, or __________, motion., suspension bridge / lateral, safety measure / further, setback / complicated, To __________, the manager organized a daily meeting for all the architects., figure out, facilitate communication, be behind schedule, The bridge began __________ because the rhythm of people's footsteps was too regular., to wobble, to involve, to appear, Installing safety nets was one of the many __________ taken during construction., safety measures, setbacks, milestones, The engineers had to __________ how to stop the swaying without closing the bridge forever., figure out, remain, be seasick, When the ground started shaking, I knew there would be trouble. I __________., suffered, saw that coming, was behind schedule, It isn't __________ to blame the workers for the delay caused by the hurricane., severe, lateral, fair, Every major project will __________ many different specialist teams., involve, wobble, reduce the risks, The project __________ a major __________ when the main crane broke down., appeared / milestone, suffered / setback, remained / safety measure, Modern technology helps engineers __________ associated with high-altitude building., reduce the risks, be seasick, go over the budget, __________ the technical problems, the bridge remains a famous landmark in London., Further, Despite, Prone to, Lightweight structures are often __________ movement caused by heavy winds., prone to, fair, complicated, The storm was so __________ that all work on the bridge had to stop for forty-eight hours., lateral, further, severe.
0%
Millenium Bridge (Multiple Choice)
Share
Share
Share
by
Kseniyaandrusen
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Quiz
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
AI Enhanced: This activity contains content generated by AI.
Learn more.
Switch template
Show all
More formats will appear as you play the activity.
)
Open results
Copy link
QR code
Delete
Continue editing:
?