Lap splices of bundled bars shall be in accordance with the requirements below, except for:, Entire bundles shall be lap spliced, Lap splices of bars in the bundle shall be based on the lap splice length required for the individual bars within the bundle, Entire bundles shall not be lap spliced, Individual bar splices within a bundle shall not overlap, As per Standard Specification for on the Use of Conditional Item 310(15) – Bituminous Concrete Surface Course with Low Density Polyethylene (LDPE) plastic Bag Waste, Hot-Laid (Department Order No. 139, Series of 2024), LDPE plastic bag waste content shall not exceed ____ by weight of binder, 9.39%, 6.39%, 7.39%, 8.39%, Bituminous Plant-Mix surface course pavement having IRI value of 3.55 will received, None of the above, No payment, Price Adjustment, 100% Payment, Item 311 – PCCP pavement having IRI value of ___ and below is subjected to 100% Payment, 4.0, 3.5, 5.0, 3.0, Used to delineate the edge of the travelled way to distinguish it from the shoulder area, Edge lines, Center line, Barrier lines, Lane lines, As per DPWH Standard Specification for Item 623 – Traffic Signalization System (D.O. No 203, Series of 2024), the traffic signal controller shall be designed to operate at Maximum operating temperature of ____, 85°C, 95°C, 75°C, 65°C, The use of reflective pavement studs shall only be considered in areas where, aside from retroreflective pavement markings, improved lane guidance, increased visibility and enhanced safety is required, such as the following, EXCEPT:, No passing zones, In winding roads and road crash prone areas, Middle of sidewalk, Bike lane, As per Amendments to DPWH Standard Specification For Item 611 – Tree Planting (Department Order No. 034, Series of 2023), deciduous trees from 1.20 in to 1.80 in in height shall have ___ vertical support stake, three, no, two, one, Used where overtaking is prohibited, usually at vertical and horizontal curves, Lane lines, Edge lines, Barrier lines, Center line, As per DPWH Standard Specification for Item 623 – Traffic Signalization System (D.O. No 203, Series of 2024), the traffic signal controller shall be designed to operate at Maximum ambient temperature of ____, 65°C, 125°C, 95°C, 75°C, As per Standard Specification for on the Use of Conditional Item 310(15) – Bituminous Concrete Surface Course with Low Density Polyethylene (LDPE) plastic Bag Waste, Hot-Laid (Department Order No. 139, Series of 2024), VMA% should be ____, 14%, 16%, 18%, 12%, For contact lap splices of parallel non-prestressed reinforcement in a horizontal layer, minimum clear spacing between the contact lap splice and adjacent splices or bars shall be whichever is the largest of the following, except for:, 4/3 nominal maximum size of coarse aggregates, 50mm;, 25 mm, nominal diameter of bar, As per DPWH Standard Specification for Item 623 – Traffic Signalization System (D.O. No 203, Series of 2024), the controller shall utilize a minimum of _____ microprocessor technology, 4-bit, 8-bit, 32-bit, 16-bit, For non-contact splices in flexural members, the transverse center-to-center spacing of spliced bars shall be ___ of the required lap splice length but not less than 150 mm, 1/2, 1/4, 1/3, 1/5, Used to separate adjacent lanes of the traffic moving in the same direction, Barrier lines, Lane lines, Edge lines, Center line, As per Department Order No. 159, Series of 2023, the color of reflective pavement studs on locations of fire hydrants is _____, White, Blue, Yellow, Green, As per Department Order No. 159, Series of 2023, Retroreflective pavement studs (also known as Retroreflective Markers) are classified as to type and color. The following are the types EXCEPT for:, Type C – Two way reflective markers, two colors, Type D – One way reflective markers, two colors, Type A – Two way reflective markers, one color, Type C – Oneway reflective markers, one color, Item 311 – PCCP pavement having IRI value of above ___ is subjected to 50% Pay adjustment, 6.0, 3.5, 4.5, 3.0, As per Standard Specification for on the Use of Conditional Item 310(15) – Bituminous Concrete Surface Course with Low Density Polyethylene (LDPE) plastic Bag Waste, Hot-Laid (Department Order No. 139, Series of 2024), mixture shall have an Index of Retained Strength of not less than ____, 80, 90, 70, 100, As per Department Order No. 159, Series of 2023, the color of reflective pavement studs on crosswalks or pedestrian crossings is _____, Green, Yellow, Red, White, As per Department Order No. 078, Series of 2022, projects and onwards involving Item 522 – Active and Passive Protection Systems for Unstable Slope with total cost of ________ and above shall be submitted to Bureau of Design for review and evaluation prior to the approval of the Head of Implementing Office concerned., Php 60 Million, Php 50 Million, Php 40 Million, Php 30 Million, For Item 311 – PCCP Project, exemption on the use of slip-form paver is allowed under the following conditions, except for:, Project located in island municipalities wherein the cost of mobilization of slip form paver is more expensive and not practical, Widening or shoulder sealing where there is not enough working space for the track pad and sensor, Project costing P25 Million and above, Re-blocking projects that are usually done at intermittent sections, As per DPWH Standard Specification for Item 623 – Traffic Signalization System (D.O. No 203, Series of 2024), the traffic signal controller shall be designed to operate at Relative humidity range of 5% to ____, 85%, 75%, 65%, 95%, As per DPWH Standard Specification for 420 – Precast Concrete Arch Panel, precast concrete arch panels shall be of Class ___, C, B, P, A, As per Department Order No. 159, Series of 2023, the color of reflective pavement studs on one-way roadways, or ramps or travelled lanes that shall not be enters is _____, Blue, White, Red, Yellow, Used to separate opposite traffic movements on an undivided roadway ramp; is generally placed centrally on all roads and bridges 6.0 m more in width, Lane lines, Center line, Edge lines, Barrier lines, As per Department Order No. 159, Series of 2023, the color of reflective pavement studs on conflict points of bicycle lanes is _____, Green, Blue, Yellow, White, As per Standard Specification for on the Use of Conditional Item 310(15) – Bituminous Concrete Surface Course with Low Density Polyethylene (LDPE) plastic Bag Waste, Hot-Laid (Department Order No. 139, Series of 2024), mixture shall have a minimum compressive strength of ____, 2.4 MPa, 4.4 MPa, 3.4 MPa, 1.4 MPa.

Leaderboard

Visual style

Options

Switch template

)
Continue editing: ?