Clearing shall extend how far beyond the toe of fill slopes or beyond rounding of cut slopes?, 300 mm, 6 meters, 1 meter, 150 mm, In areas outside grading limits, stumps and nonperishable solid objects shall be cut off not more than how high above the ground line?, 450 mm, 300 mm, 75 mm, 150 mm, In areas covered by cogon, talahib, wild grass, and other vegetation, topsoil shall be cut to a maximum depth of:, 75 mm, 150 mm, 300 mm, 600 mm, Materials and debris that cannot be burned and are perishable shall be covered with at least:, 300 mm, 200 mm, 150 mm, 450 mm, Wood chips used as mulch for slope erosion control shall have a maximum thickness of:, 12 mm, 150 mm, 75 mm, 20 mm, Branches of trees extending over the roadbed shall be trimmed to give a clear height of:, 1.4 m, 10 m, 3 m, 6 m, The diameter of trees shall be measured at what height above the ground?, 1.2 m, 1.4 m, 1.0 m, 1.6 m, Trees less than what diameter will not be measured for payment?, 100 mm, 75 mm, 150 mm, 300 mm, Substructures of existing structures outside the stream shall be removed down to at least:, 450 mm below natural ground surface, 600 mm below natural ground surface, 300 mm below natural ground surface, 150 mm below natural ground surface, Broken concrete pavement, base course, sidewalks, curbs, and gutters shall not exceed what size in any dimension?, 300 mm, 150 mm, 500 mm, 200 mm, Stemming material for excavation must pass what standard sieve size?, 20 mm, 9.5 mm, 4.75 mm, 12 mm, The variance from the true plane of the excavated backslope shall not exceed:, 450 mm, 150 mm, 600 mm, 300 mm, A construction working bench at the bottom of each lift may have a maximum offset of:, 600 mm, 150 mm, 300 mm, 450 mm, Rock shall be excavated below subgrade within the limits of the roadbed to a depth of:, 450 mm, 150 mm, 300 mm, 75 mm, In structure excavation, when rock or hardpan is encountered, it shall be removed below foundation grade for at least:, 600 mm, 150 mm, 300 mm, 450 mm, Backfill around structures shall be placed in horizontal layers not over:, 75 mm, 200 mm, 300 mm, 150 mm, Roadway embankment of earth material shall be placed in horizontal layers not exceeding:, 200 mm, 300 mm, 600 mm, 150 mm, Full-scale compaction trials shall be carried out on areas not less than:, 15 m wide and 50 m long, 20 m wide and 100 m long, 5 m wide and 25 m long, 10 m wide and 50 m long, The required uniform density for embankment layers under AASHTO T99 Method C is not less than:, 85%, 95%, 90%, 98%, The free-haul distance for overhaul is:, 450 m, 1,000 m, 600 m, 300 m, Wood chips not designated for use under other sections shall be spread in layers not exceeding:, 12 mm, 75 mm, 300 mm, 150 mm, Wood chips used as mulch for slope erosion control shall have a maximum face area of:, 3,900 mm², 1,500 mm², 5,000 mm², 300 mm², For embankment topping, not more than what percent shall pass the No. 200 sieve?, 10%, 25%, 30%, 15%, The liquid limit for embankment material shall be:, Not more than 40, Not more than 50, Not more than 30, Not more than 20, When compacted road surface containing granular materials lies within 900 mm of the subgrade, it shall be scarified to a depth of at least:, 600 mm, 150 mm, 300 mm, 75 mm, Individual rocks and boulders greater than 600 mm in diameter may be placed, provided they do not exceed what height when placed?, 1,500 mm, 600 mm, 900 mm, 1,200 mm, In subgrade preparation, the permitted variation from the design level of surface is:, 10 mm, 50 mm, 20 mm, 30 mm, In subgrade preparation, the permitted surface irregularity is:, 30 mm, 20 mm, 45 mm, 10 mm, For compaction equipment, the minimum mass of vibratory steel-wheel rollers is:, 3 tonnes, 4 tonnes, 6 tonnes, 5 tonnes, The amount of hauling required to move one cubic meter of material one kilometer beyond the free-haul distance is measured in:, Linear meter, Cubic meter-kilometer, Square meter-kilometer, Cubic meter

Part C - Summary

Leaderboard

Visual style

Options

AI Enhanced: This activity contains content generated by AI. Learn more.

Switch template

Continue editing: ?