The aircraft was towed to the maintenance hangar., to pull a vehicle or aircraft using another vehicle., Fuel is highly inflammable., able to catch fire very easily, Engineers replaced several parts of the landing gear., the wheels and supporting structure that an aircraft uses for landing and taking off., The pipe has a diameter of 15 centimetres., the distance across a circle through its centre (średnica), Most external operations require special safety equipment., work carried out on the outside of the aircraft rather than inside it., The Boeing 777 is undergoing a heavy check., a major scheduled aircraft maintenance inspection in which the aircraft is extensively dismantled, inspected, repaired and tested., The aircraft was stripped naked for inspection., to remove everything from it until only the basic structure remains., The supervisor directed the aircraft's manoeuvres inside the hangar., to guide or control the movement of vehicles, aircraft or machinery., Engineers worked from the scaffolding docks to inspect the fuselage., large movable platforms and scaffold structures built around an aircraft to allow engineers to safely reach all parts during maintenance., The Boeing 777 has an unladen weight of around 145 tonnes., the weight of a vehicle or aircraft without passengers, cargo, fuel, or other load.
0%
13.07
Share
Share
by
Educato
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Match up
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
Open results
Copy link
QR code
Delete
Continue editing:
?