The engineering team is trying to ___ the source of the memory leak., roll out, track down, We tested the database connection first to ___ network issues as the cause., rule out, bring up, The latest release caused several errors, so we had to ___ to the previous version., roll back, take over, The security team must ___ the new authentication process before deployment., sign off on, run into, We plan to ___ the new feature gradually, starting with 10% of our users., figure out, roll out, We ___ an unexpected compatibility problem during the system upgrade., signed off on, ran into, I’d like to ___ a concern about the proposed release date., bring up, rule out, Priya will ___ as tech lead while Marcus is on leave., take over, track down, The developers need to ___ why the automated tests keep failing., roll back, figure out
0%
Software development phrasal verbs
Share
Share
by
Teachermatheus2
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Quiz
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
Open results
Copy link
QR code
Delete
Continue editing:
?