The engineering team is trying to ___ the source of the memory leak., roll out, track down, We tested the database connection first to ___ network issues as the cause., rule out, bring up, The latest release caused several errors, so we had to ___ to the previous version., roll back, take over, The security team must ___ the new authentication process before deployment., sign off on, run into, We plan to ___ the new feature gradually, starting with 10% of our users., figure out, roll out, We ___ an unexpected compatibility problem during the system upgrade., signed off on, ran into, I’d like to ___ a concern about the proposed release date., bring up, rule out, Priya will ___ as tech lead while Marcus is on leave., take over, track down, The developers need to ___ why the automated tests keep failing., roll back, figure out

Software development phrasal verbs

Leaderboard

Visual style

Options

Switch template

Continue editing: ?