We follow the protocols., The protocols are followed., The team checks the inventory every week., The inventory is checked every week., The technicians carried out a full inspection., A full inspection was carried out., A malfunction stopped the assembly line., The assembly line was stopped., We set up a new ticket system., A new ticket system was set up., The factory passed the safety inspection., The safety inspection was passed., We will review the procedure in January., The procedure will be reviewed in January., The IT department will install the software tonight., The software will be installed tonight., They will train all the new employees., All the new employees will be trained., The system will generate the reports automatically., The reports will be generated automatically., The auditors will check our compliance in March., Our compliance will be checked in March., We schedule maintenance twice a year., Maintenance is scheduled twice a year., The supplier sends the material on Mondays., The material is sent on Mondays
0%
Protocols & Procedures at Work
Share
Share
by
Teacherjordi
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Flash cards
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
Open results
Copy link
QR code
Delete
Continue editing:
?