Muda, Waste or activities that do not add value to the end product, Kaizen, A mindset of continuous, incremental improvement involving everyone in the organization, Value Stream Mapping (VSM), A visual technique used to analyze the current workflow state and design an improved flow with less waste, Pull System, A workflow method where work is pulled into production only when capacity exists, limiting Work in Progress, Kanban, An example of a pull system that uses visual boards to manage and control workflow, Lead Time, The total time elapsed from when a work item is initially requested until it is fully delivered, Cycle Time, The active time spent working on an item from the moment work begins until it is completed, Throughput, The number of work items completed successfully per unit of time, Work in Progress (WIP), The count of unfinished items currently being worked on within a system, PDCA Cycle, A continuous improvement framework consisting of four steps: Plan, Do, Check, and Act
0%
Lean Software Development - Vocabulary
Share
Share
by
Englishserviceses
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Match up
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
Open results
Copy link
QR code
Delete
Continue editing:
?