Class of structural concrete intended for all superstructures and heavily reinforced substructures., Class A, Class B, Class C, Class P, Class of structural concrete intended for footings, pedestals, massive pier shafts., Class A, Class C, Class P, Class B, Class of structural concrete intended for thin reinforced sections, railings, precast R.C. piles., Class A, Class C, Class P, Class B, Class of structural concrete intended for prestressed concrete structures and members., Seal, Class A, Class P, Class B, Class of structural concrete intended for concrete deposited in water., Class A, Class P, Seal, Class C, Structural concrete Type A shall have a maximum water/cement ratio of ______., 0.58, 0.49, 0.55, 0.53, Structural concrete Type B shall have a maximum water/cement ratio of ______., 0.55, 0.58, 0.49, 0.53, Structural concrete Type C shall have a maximum water/cement ratio of ______., 0.55, 0.53, 0.58, 0.49, In Item 405 - Structural Concrete, as work progresses, at least one sample consisting of three concrete cylinder test specimens, ______ shall be taken from every volume of concrete., 200 × 400 mm, 200 × 300 mm, 150 × 400 mm, 150 × 300 mm, In Item 405 - Structural Concrete, as work progresses, at least one sample consisting of three concrete cylinder test specimens shall be taken from each ____ cubic meters of each class of concrete., 75 m³, 25 m³, 100 m³, 50 m³, In Item 405 - Structural Concrete, a change in the source of materials during the progress of work ___________., Shall not be allowed, May necessitate a new mix design, Will require the same mix design, None of the above, Structural concrete Type A shall require ___ bags of cement (40 kg/bag) per cubic meter of concrete., 8 bags, 9.5 bags, 9.1 bags, 11 bags, Structural concrete Type B shall require ___ bags of cement (40 kg/bag) per cubic meter of concrete., 8 bags, 9.1 bags, 11 bags, 9.5 bags, Structural concrete Type C shall require ___ bags of cement (40 kg/bag) per cubic meter of concrete., 9.1 bags, 9.5 bags, 8 bags, 11 bags, Structural concrete Type P shall require ___ bags of cement (40 kg/bag) per cubic meter of concrete., 9.1 bags, 8 bags, 11 bags, 9.5 bags, Structural concrete - Seal shall require ___ bags of cement (40 kg/bag) per cubic meter of concrete., 8 bags, 9.1 bags, 11 bags, 9.5 bags, Structural concrete - Seal shall have a slump range of ____ mm., 50–100 mm, None of the above, 100 max, 100–200 mm, Structural concrete Type A shall have a slump range of ____ mm., 50–100 mm, 50 max, 100 max, 100–200 mm, Structural concrete Type P shall have a slump range of ____ mm., 50–100 mm, 100 mm maximum, 75 max, 50 max, Structural concrete Type P shall have a minimum compressive strength of ____ MPa (at 28 days)., 20.7 MPa, 16.5 MPa, 37.7 MPa, None of the above, Structural concrete Type A shall have a minimum compressive strength of ____ MPa (at 28 days)., 20.7 MPa, 16.5 MPa, 28.2 MPa, 37.7 MPa, Structural concrete Type B shall have a minimum compressive strength of ____ MPa (at 28 days)., 20.7 MPa, 37.7 MPa, 16.5 MPa, 28.2 MPa, In Item 405 - Structural Concrete, production requirement, Portland cement shall have an accuracy of batching within plus or minus ___ mass percent., 2%, 0.5%, 3%, 1%, In Item 405 - Structural Concrete, production requirement, water shall have an accuracy of batching within plus or minus ___ mass percent., 0.75%, 1%, 2%, 0.5%, In Item 405 - Structural Concrete, production requirement, admixtures shall have an accuracy of batching within plus or minus ___ percent., 2%, 1%, 3%, 0.5%, In Item 405 - Structural Concrete, production requirement, aggregates shall be conducted within ____ mass percent maximum tolerance for the required materials., 2%, 3%, 1%, 0.5%, In Item 405 - Structural Concrete, production requirement, the intervals between delivery of batches shall not be so great as to allow the concrete in place to harden partially, and in no case shall such an interval exceed _____ minutes., 40 minutes, 30 minutes, 20 minutes, 10 minutes, In Item 405 - Structural Concrete, production requirement, a mixer having a rated capacity of less than a ____ batch shall not be used., Two-bag, Four-bag, Three-bag, One-bag, In Item 405 - Structural Concrete, production requirement, mixing time shall not be less than _____ seconds for mixers having a capacity of 1.5 m³ or less., 120 seconds, 60 seconds, 75 seconds, 90 seconds, In Item 405 - Structural Concrete, production requirement, for mixers having a capacity greater than 1.5 m³, the mixing time shall not be less than ____ seconds., 120 seconds, 60 seconds, 90 seconds, 75 seconds, In Item 405 - Structural Concrete, production requirement, truck mixing shall not be less than ___ revolutions after all ingredients, including water, are in the drum., 300 revolutions, 200 revolutions, 400 revolutions, 100 revolutions, In Item 405 - Structural Concrete, production requirement, truck mixing speed shall not be less than ____ rpm, nor more than ____ rpm., 4–6 rpm, 5–6 rpm, 5–8 rpm, 4–8 rpm, In Item 405 - Structural Concrete, production requirement, when a truck mixer or agitator is used for transporting concrete to the delivery point, discharge shall be completed within ___ hour/s, or before 250 revolutions of the drum or blades., 1 hour, 1.5 hours, 2 hours, 2.5 hours, In Item 405 - Structural Concrete, if lean concrete is required, it should have a minimum compressive strength of ____ MPa., 20.7 MPa, 13.8 MPa, 27.6 MPa, 17.7 MPa, When placing operations would involve dropping the concrete more than ____ m, concrete shall be conveyed through sheet metal or approved pipes., 2.0 m, 3.0 m, 1.0 m, 1.5 m, Item 407, Placing Concrete by Pneumatic Means, discharge lines shall be ______ from the machine., Inclined upwards, Vertical, Either horizontal or inclined upwards, Horizontal, Item 407, Placing Concrete by Pneumatic Means, the discharge end of the line shall not be more than ____ from the point of deposit., 2 m, 3 m, 1 m, 4 m, Item 407, Placing Concrete in Water, a tremie shall consist of a tube having a diameter of not less than ____ constructed in sections having flanged couplings fitted with gaskets with a hopper at the top., 250 mm, 150 mm, 450 mm, 350 mm, Item 407, Casting Columns, the load of the superstructure shall not be allowed to come upon the bents until they have been in place at least ____ days., 28 days, 21 days, 14 days, 7 days, Item 407, Casting of Slabs and Girders, when placing concrete in two separate operations, bond between stem and slab shall be secured by means of suitable shear keys which may be formed by the use of timber blocks approximately _______ in cross-section., 25 mm × 50 mm, 25 mm × 75 mm, 50 mm × 75 mm, 50 mm × 100 mm, Which of the following is NOT the type of concrete surface finishing in Item 407 - Concrete Structures?, Floated Finish, Ordinary Finish, Rubbed Finish, Shiny Finish, Structural concrete Type P shall have a maximum water/cement ratio of ______., 0.49, 0.55, 0.53, 0.58, Structural concrete Type Seal shall have a maximum water/cement ratio of ______., 0.53, 0.49, 0.58, 0.55, Structural concrete Type A shall have a designated size of coarse aggregate of ______., 2.0" to No. 4, 1.5" to No. 4, 0.5" to No. 4, 1.0" to No. 4, Structural concrete Type C shall have a designated size of coarse aggregate of ______., 2.0" to No. 4, 1.5" to No. 4, 0.5" to No. 4, 1.0" to No. 4, In Item 407, curing concrete using the water method, concrete shall be kept continuously wet by the application of water for a minimum period of ___ after the concrete has been placed., 7 days, 14 days, 10 days, 12 days, In Item 407, curing concrete using curing compound, it shall be applied with a pressure spray in such a manner as to cover the entire concrete surface with a uniform film and shall be of such character that it will harden within ____ minutes after application., 10 minutes, 20 minutes, 40 minutes, 30 minutes, In Item 407, curing concrete using curing compound, should the film of compound be damaged from any cause before the expiration of ___ after the concrete is placed in the case of structures, the damaged portion shall be repaired immediately with additional compound., 5 days, 7 days, 10 days, 12 days, In Item 407, curing concrete using the waterproof membrane method, it shall remain in place for a period of not less than ____ hours., 24 hours, 96 hours, 48 hours, 72 hours, In Item 407, curing concrete using the forms-in-place method, the forms shall remain in place for a minimum period of ___ days after the concrete has been placed., 7 days, 9 days, 5 days, 10 days, In Item 407, curing precast concrete using steam curing, the curing temperature throughout the enclosure shall not exceed _____., 55°C, 45°C, 65°C, 35°C, In Item 407, curing precast concrete using steam curing, during application of the steam, the temperature rise within the enclosure shall not exceed ____ per hour., 45°C, 20°C, 30°C, 65°C, In Item 407, falsework supporting deck overhangs and deck slabs between girders shall not be released until ___ days after the deck concrete has been placed., 21 days, 28 days, 14 days, 7 days, In Item 407, no falsework for bridges shall be released until the supported concrete has attained a compressive strength of at least _____ of the required 28-day strength., 100%, 90%, 80%, 70%, In Item 407, for formwork construction, forms for exposed surfaces shall be constructed with triangular fillets at least ____ wide attached so as to prevent mortar runs and to produce smooth straight chamfers at all sharp edges of the concrete., 10 mm, 20 mm, 30 mm, 40 mm, In Item 407, when concrete strength tests are used for removal of forms and supports, such removal should not begin until the concrete has attained the percentage of the specified design strength. For floor slabs, a minimum time of ____ shall have passed before the removal of its formworks., 14 days, 2 days, 1 day, 7 days, In Item 407, when concrete strength tests are used for removal of forms and supports, such removal should not begin until the concrete has attained the percentage of the specified design strength. For walls, a minimum time of ____ shall have passed before the removal of its formworks., 3 days, 10 days, 7 days, 1 day, In Item 407, when concrete strength tests are used for removal of forms and supports, such removal should not begin until the concrete has attained the percentage of the specified design strength. For columns, a minimum time of ____ shall have passed before the removal of its formworks., 7 days, 2 days, 5 days, 10 days, In Item 407, when concrete strength tests are used for removal of forms and supports, such removal should not begin until the concrete has attained the percentage of the specified design strength. For columns, a minimum percentage of design strength of ____ shall be attained before the removal of formworks., 100%, 80%, 70%, 90%, In Item 407, when concrete strength tests are used for removal of forms and supports, such removal should not begin until the concrete has attained the percentage of the specified design strength. For walls, a minimum percentage of design strength of ____ shall be attained before the removal of formworks., 70%, 60%, 80%, 90%, For precast concrete, members shall be held for a minimum ___ hour/s pre-steaming period., 3 hours, 2 hours, 4 hours, 7 hours, In sampling of freshly mixed concrete, the elapsed time shall not exceed _____ between obtaining the first and final portions of the composite sample., 15 min, 20 min, 12 min, 10 min, In sampling of freshly mixed concrete, start tests for slump, temperature, and air content within ___ after obtaining the final portion of the composite sample., 15 min, 5 min, 20 min, 10 min, In sampling of freshly mixed concrete using stationary mixers, sample the concrete by collecting ____ or more portions taken at regularly spaced intervals during discharge of the middle portion of the batch., 4, 3, 2, 5, In sampling of freshly mixed concrete using stationary mixers, no samples should be taken before ___ % or after ___% of the batch has been discharged., 20 and 80, 10 and 80, 20 and 90, 10 and 90, In sampling of freshly mixed concrete using paving mixers, obtain samples from at least ____ different portions of the pile and then composite into one sample for test purposes., 2, 5, 3, 4, In sampling of freshly mixed concrete using revolving drum truck mixers, sample the concrete by collecting two or more portions taken at regularly spaced intervals during discharge of the ____ portion of the batch., First, Last, None of the above, Middle, In Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete, when the sample has a slump greater than 3 in, to consolidate, the sample must be ___., Rodded, Rodded or Vibrated, Vibrated, None of the above, In Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete, when the sample has a slump of 1 to 3 in, to consolidate, the sample must be ___., Rodded, None of the above, Rodded or Vibrated, Vibrated, In Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete, when the sample has a slump of less than 1 in, to consolidate, the sample must be ___., None of the above, Vibrated, Rodded or Vibrated, Rodded, In Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete, to consolidate the sample, when rodding is used, rod each layer with ____ strokes of the tamping rod when nominal 14-L or smaller measures are used., 75, 50, 40, 25, In Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete, to consolidate the sample, when rodding is used, rod each layer with ____ strokes of the tamping rod when nominal 28-L measures are used., 100, 25, 50, 75, In Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate, a sample of aggregate is immersed in water for 24 ± ___ hours to essentially fill the pores., 4, 1, 3, 2, In Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate, if A is the mass of oven-dry sample, B is the mass of pycnometer filled with water, C is the mass of pycnometer with specimen and water, and S is the mass of saturated surface-dry specimen. How do we solve the oven-dry specific gravity?, A / (B + S - C), A / (B + A - C), A / (B - S - C), S / (B + S - C), In Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate, if A is the mass of oven-dry sample, B is the mass of pycnometer filled with water, C is the mass of pycnometer with specimen and water, and S is the mass of saturated surface-dry specimen. How do we solve the SSD specific gravity?, A / (B + S - C), A / (B + A - C), S / (B + S - C), S / (B - S - C), In Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate, if A is the mass of oven-dry sample, B is the mass of pycnometer filled with water, C is the mass of pycnometer with specimen and water, and S is the mass of saturated surface-dry specimen. How do we solve the apparent specific gravity?, S / (B + S - C), A / (B + S - C), S / (B - S - C), A / (B + A - C), In slump test for concrete, the first fill must be at a height of ____ mm from the bottom., 80, 70, 100, 90, In slump test for concrete, the second fill must be at a height of ____ mm from the bottom., 180 mm, 190 mm, 160 mm, 200 mm, In slump test for concrete, the mold must have a bottom diameter of ____., 200 mm, 100 mm, 300 mm, 250 mm, In slump test for concrete, the mold must have a top diameter of ____., 150 mm, 100 mm, 200 mm, 125 mm, In slump test for concrete, the mold must have length of ____., 250 mm, 400 mm, 200 mm, 300 mm, In making and curing concrete test specimens, for cylindrical specimens, the length ______ the diameter., Equal to twice, Equal to 4x, Equal, Equal to thrice, In making and curing concrete test specimens, for beam specimens, the length shall be at least ____ greater than three times the depth., 3 in, 1 in, 4 in, 2 in, In making and curing concrete test specimens, for cylindrical specimens, ___ layers of equal depth must be used to rod for specimen with diameter of 4 in., 4, 5, 2, 3, In making and curing concrete test specimens, for cylindrical specimens, ___ layers of equal depth must be used to rod for specimen with diameter of 6 in., 5, 3, 2, 4, In making and curing concrete test specimens, for cylindrical specimens, ___ layers of equal depth must be used to rod for specimen with diameter of 9 in., 5, 2, 3, 4, In making and curing concrete test specimens, for beam specimens, ___ layers of equal depth must be used to rod for specimen with width of 6 to 8 inches., 3, 4, 2, 5, In making and curing concrete test specimens, after each layer is vibrated, tap the outsides of the mold at least ____ times with the mallet., 10, 5, 20, 15, In making and curing concrete test specimens, for initial curing, immediately after molding and finishing, the specimens shall be stored for a period up to ____ hours., 36, 48, 24, 72, In making and curing concrete test specimens, for initial curing, immediately after molding and finishing, the specimens shall be stored in a temperature range from ______°C and in an environment preventing moisture loss from the specimens., 16 and 30, 16 and 27, 18 and 30, 18 and 27, In making and curing concrete test specimens, for initial curing, immediately after molding and finishing, the specimens with specified strength of 6000 psi or greater shall be stored in a temperature range from ______°C., 25 and 36, 18 and 24, 20 and 26, 16 and 27, In making and curing concrete test specimens, for final curing, at all times, the specimen shall be cured at a temperature of ______ using water storage tanks., 25 ± 2°C, 23 ± 4°C, 25 ± 4°C, 23 ± 2°C, In making and curing concrete test specimens, for final curing, beams are to be cured the same as cylinders except that they shall be stored in water saturated with calcium hydroxide at least ____ hours prior to testing., 20, 26, 24, 22, For ASTM C39 or AASHTO T22, compressive strength of molded concrete cylinder, it is limited to concrete having a unit weight in excess of _____ kg/m³., 1200, 1000, 800, 600, For ASTM C39 or AASHTO T22, Compressive Strength of Molded Concrete Cylinder, specimens shall not be tested if any individual diameter of a cylinder differs from any other diameter of the same cylinder by more than __ %., 2, 6, 4, 1, For ASTM C39 or AASHTO T22, compressive strength of molded concrete cylinder, neither end of compressive test specimens when tested shall depart from perpendicularity to the axis by more than:, 1.5°, 1.0°, 2.0°, 0.5°, For ASTM C39 or AASHTO T22, compressive strength of molded concrete cylinder, test specimens for a given test age shall be broken within the permissible time tolerances. For a test age of 28 days, the tolerance is ____., 10 hrs, 20 hrs, 15 hrs, 25 hrs, For ASTM C39 or AASHTO T22, compressive strength of molded concrete cylinder, test specimens for a given test age shall be broken within the permissible time tolerances. For a test age of 7 days, the tolerance is ____., 12 hrs, 18 hrs, 6 hrs, 3 hrs, In compressive strength of molded concrete cylinder, hydraulically operated machines shall have a loading rate of movement (platen to crosshead measurement) corresponding to a loading rate on the specimen within the range of:, 20 to 60 psi/s, 30 to 50 psi/s, 30 to 60 psi/s, 20 to 50 psi/s, In compressive strength of molded concrete cylinder, if the specimen length-to-diameter ratio is less than ____, correct the result obtained by multiplying by the appropriate correction factor., 1.6, 1.8, 2.2, 2.0

Visual style

Show all

Activity settings

Leaderboard

AI Enhanced: This activity contains content generated by AI. Learn more.

Switch template

Continue editing: ?