1) Which scale used to draw site plan as per the interpretation of drawings? a) 1:100 b) 1:250 c) 1:2000 d) 1:200 e) 1:110 f) 1:1000 2) Building companies are rated as per CIDB grading. a) True b) False 3) The drawings prepared by an architect, structural engineer, if required by law, will include: a) Site layout b) Site plan c) Working class d) working drawings e) Drain f) Drainage drawings 4) With Wet work we refer to all the tasks where cement is not used. a) True b) False 5) Raft foundation have the advantage of reducing differential settlements as the concrete slab resists..................between loading positions. a) materials b) special bonds c) building stregth d) differential movements e) differential movables f) differences

Construction Technology I - test quiz

Leaderboard

Visual style

Options

Switch template

Continue editing: ?