Which document indicates when materials should be ordered for a construction project?, Time sheet, Daily work sheert, Programme of works, Method statement, On a working drawing with a scale of 1:200, what length would a 10mm line represent?, 2mm, 20mm, 200mm, 2000mm, What does this symbol represent?, Sawn wood, Planed wood, Insulation, Concrete, What does this symbol represent?, WC, Sink, Door, Window, What does this hatching represent?, Concrete, Brickwork, Insulation, Stone, What does this symbol represent?, Sink, Window, Door, Wardrobe, What does this symbol represent?, Window, Door, Bath, Kitchen unit, What does this symbol represent?, Brickwork, Subsoil, Timber, Blockwork, Which of the following is the name given to a fixed level determined on site?, Building line, Frontage line, Temporary benchmark, Ordinance survey benchmark, What method is used to check for square when setting out a building?, Use a laser level, Measure the diagonals, Use a site datum, Measuring for parallel.
0%
Unit 202 a
Share
Share
Share
by
Shough
FE
Construction
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Quiz
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
)
Open results
Copy link
QR code
Delete
Continue editing:
?