Jika karyawan membawa material ke kantor, harus segera menginformasikan ke PIC TSS paling lambat berapa lama?, 2 hari kerja, 1 hari kerja, 1 bulan, 2 bulan, Material dapat disimpan ke dalam TSS paling lama berapa lama?, 1 hari kerja, 1 minggu, 1 bulan, 2 bulan, Siapa PIC TSS lantai 8 The East Tower?, Wang Chao, Chang Yu, Fan Jiaying, Shen Jie, Material apa yang wajib di simpan ke dalam TSS?, Alat uji, Aset tetap, Asset habis pakai kantor bernilai rendah, Hadiah, Suku cadang yang dibeli, Barang pameran, Apa saja yang termasuk 4 elemen kontrol ekspor?, Negara, Item, Tujuan pengiriman, Pihak, Penggunaan akhir
0%
Compliance Test
Share
Share
by
Silvanizhongxin
Dewasa
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Airplane
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
Open results
Copy link
QR code
Delete
Continue editing:
?