When selecting materials, what documents do we refer to? , Drawings and specifications, Method Statement, Risk Assessment, Programme of works, Why do we ensure correct ratio's when mixing? , It's British law. , The customer has asked for it, Ensure consistency throughout the build, We need to ensure our mix is weak, When cutting, what rule do we follow?, Cut - measure - mark, Mark - measure - cut, Mark - cut - measure, Measure - mark - cut, Where should materials be placed when mixing? , At the site entrance, Next to the mixing area, On the scaffold, Near the site boundary, Identify the tool used to find angles when cutting. , , , , , Identify the items of PPE that would give you the best protection when cutting with a masonry saw., Safety boots and hard hat, High Vis vest and visor, Safety goggles and ear defenders, Overalls and sunscreen, What should we do with our back when lifting materials?, Keep it bent, Keep it 90 degrees, Keep is 45 degrees, Keep it straight, Identify the main reason we should use lifting aids as much as possible. , Saves money, Avoiding manual handling, Insurance purposes, We have the training, Why should materials be stored just away from the trench edge?, To avoid trench collapse, So we have to walk to get them, To encourage stretching, To make it harder for us, When building a standard cavity wall, where would the blocks be loaded out to? , External side, Internal side, In the cavity, Below DPC, Identify the best reason why our working platforms are kept tidy, To make cleaning up easier, To avoid damage to brick face, To keep the customer happy, To avoid slips and trips, Where can spilled mortar end up when it splatters?, On the brickface, In the skip, On the customers head, On a public highway, Find the reason we cover all materials when not in use., To prevent theft, To prevent insect attack, To protect against inclement weather, To aid in building, When is the best time to install stone decorative features?, Before works commences , During the building process, After the building process, One week after the building process, Identify how we protect newly laid masonry from frost., Hessian, Polythene, Tarpaulin , Carpet, Identify how we protect newly laid masonry from rain, Hessian, Polythene, Carpet, Cardboard.
0%
Preparing materials
Share
Share
Share
by
Stephenbull
Workplace
Construction
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Open the box
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
)
Open results
Copy link
QR code
Delete
Continue editing:
?