Continuity of CPC - Test method 1 R1 + R2, Continuity test method 2 - Long wander lead R2, Continuity of ring final circuit - Step 1 measure end to end resistance, Continuity of RFC - Step 2 r1 + rn/4, RFC continuity - Step 3 r1 + r2/4, Insulation resistance - 500V & 1MΩ, Polarity - Correct connection of equipment & accessories, Earth fault loop impedance Ze - Measure impedance of incoming supply, PFC - Check the fault current against the breaking capacity of the protective devices, Earth fault loop impedance Zs - Measure impedance of system, Functional test - Measure disconnection of RCD, Check mechanical operation - Press test button on RCD,
0%
Testing
Share
Share
Share
by
Wlcconstruction
Edit Content
Print
Embed
More
Assignments
Leaderboard
Flip tiles
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
Open results
Copy link
QR code
Delete
Continue editing:
?