__________, we carried out the first field test to evaluate the performance of Sandvik tools., first of all, in addition, first, The tools we tested included products __________ shanks, rods, and couplings., in addition, such as, also, __________, two technicians were involved in the on-site testing., also, first, however, We used premium tools for the test. __________, we rented equipment for measuring deviation., Due to, Because, In addition, The Sandvik Speedy Bit improved drilling time. __________, the Alpha system increased precision., However, Then, Also, The test was delayed __________ the equipment arrived late., first, in addition, because, We had to postpone the trial __________ a safety incident in the area., but, due to, then, Boart products were cheaper. __________, they showed lower performance., although, however, previously, Sandvik’s ROP increased by 67%. __________, its TDC was reduced by 24%., while, because, then, __________, Sandvik tools outperformed the competitors in almost all aspects., While, for instance, In conclusion

Mining project: Connectors

Leaderboard

Visual style

Options

Switch template

Continue editing: ?