1) Which of the following statement is false: a) Concept Design is elaborated during Tender b) Construction drawings (IFC) usually include Bar Bending Schedule c) Technical Queries can be submitted during Tender and Engineering Stage  2) One of the below is not elaborated during Construction Drawing Stage (IFC): a) Formwork & Reinforcement Drawings b) Tight Coordination between all trades c) Reflect Changes done during site execution d) Dimensions and Level coordinated 3) What are the common interventions of the civil design team in Tender Project and in the Awarded Engineering Project a) Civil Design Basis/ Detailed construction drawings / Value Engineering b) Coordination between all trades / Bar bending Schedule / Civil Design Criteria c) Civil Design Basis / Technical queries / Value Engineering 4) Software Simulation can be done during a) Tender Stage only b) Engineering Stage only c) Tender and Engineering Stages d) None of the above