EARTHWORKS: Structure Excavation, Structure Backfill, Gravel Bedding, Regular Fill, Concrete Works: Isolated Footing, Combined Footing, RC Column, RC Grade Beam, RC Tie Beam, RC Roof Beam, RC Stairwell, RC Countertop, Masonry Works: 100mm. Thk. CHB, 150mm. Thk. CHB, Plastering, Tile Finish, Waterproofing, Carpentry Works: Suspended Ceiling, Spandrel Ceiling, Cabinets & Shelves, Drywall Partition, Steel Works: Roof Framing Works, Handrailing, Sun Buffer, Fire Exit Ladder, Tinnery Works: LS Rib-type Rfg. Shts., LS Corrugated Rfg. Shts., Asphalt Shingle, Fabricated Rfg. Acc., Sanitary and Plumbing Works: Septic Vault, Waste &Vent Line, Water Line, Plumbing Fixtures, Catch Basin, Trench Drain,
0%
VARIOUS ITEM OF CIVIL WORKS FOR VERTICAL PROJECTS
Share
Share
Share
by
Maugaerlan0330
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Group sort
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
Open results
Copy link
QR code
Delete
Continue editing:
?