1) Which of the following is not a feature of work programmes a) To ensure the job is completed on time b) To organise materials when needed c) To keep a check on the site manager d) To ensure that each trade is scheduled for work on site 2) Site programmes are used to determine a) Importance order of work operations b) Seniority of site managers c) Importance of architects assistances  d) Sequence of ordering materials 3) Manufactures technical information a) Gives costing of their materials b) Carrying out daily checks c) Having a quality control system  d) Provides detailed information about their products 4) Implementation of company procedures can be checked by   a) Having a quality control system b) Carrying out monthly checks c) Testing operatives knowledge on a daily basis d) Closely watching operatives 5) Which of the following would you not expect to see on a specification relating to strip foundations   a) Depth of the hardcore bed b) The width of the strip c) The concrete mass d) Location of reinforcing bars 6) Which of the following would you not expect to see on a specification relating to soil retaining brick walls  a) Air Brick b) The width of the cavity  c) The DPC d) Weep holes 7) Which of the following is not classed as a surface finish  a) Wallpaper b) Cement render c) Breather membrane d) Gypsum Plaster  8) Which of the following is not classed as a surface finish for roofs  a) Roof Shingles b) Slates  c) Mineral felt d) Felt underlay 9) Which of the following can be taken from a block plan and a site plan a) North Direction b) Datum c) Room layout d) Services location 10) What is the maximum angle which can be set /measured  using a semi circular protractor a) 45 degrees b) 180 degrees c) 90 degrees d) 360 degrees

Building Principles 1

Leaderboard

Visual style

Options

Switch template

Continue editing: ?