Program phase: initial requirements, budget estimation, planning, needs analysis, benchmarking , scope of work, technical specifications, client objectives, Design phase: architectural design, engineering design, conceptual design, schematic design, construction documents, drawings/blueprints, design approvals, Construction Phase: installation, Cabling, Troubleshooting, construction management, on-site visits, Mechanical, electrical, plumbing, HVAC, Verifying Phase: System testing, Final adjustments, Test screenings, Audio-visual calibration, Sign-off, Support Phase : Ongoing maintenance, Technical support, Training sessions, Warranty services, Help desk, User manuals,
0%
Phases of a project
Share
Share
Share
by
Katerina152
Edit Content
Print
Embed
More
Assignments
Leaderboard
Show more
Show less
This leaderboard is currently private. Click
Share
to make it public.
This leaderboard has been disabled by the resource owner.
This leaderboard is disabled as your options are different to the resource owner.
Revert Options
Group sort
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
Open results
Copy link
QR code
Delete
Continue editing:
?